This week for Inquiry we needed to created a DLO label the different parts of the Panmure Bridge. I needed to draw my own Panmure Bridge. My favorite part was creating the deck because it really help me focus because I needed to think about the size,shape and layout. The hardest part about creating the bridge was the Iron Swing Span.
I am a Year 8 student at Panmure Bridge School in Auckland, NZ. I am in Learning Space 2 and my teacher is Mrs Anderson.
Showing posts with label Panmure Bridge Timeline. Show all posts
Showing posts with label Panmure Bridge Timeline. Show all posts
Wednesday, 26 September 2018
Panmure Bridge Label Drawing
This week for Inquiry we needed to created a DLO label the different parts of the Panmure Bridge. I needed to draw my own Panmure Bridge. My favorite part was creating the deck because it really help me focus because I needed to think about the size,shape and layout. The hardest part about creating the bridge was the Iron Swing Span.
Thursday, 23 August 2018
Panmure Bridge Timeline
This week for Inquiry we were creating a Timeline about the Panmure Bridge. Here is my presentation Timeline. The years that are in this presentation are 1864 and 1865, 1915 and 1916. In between the year, 1864 and 1865 Panmure Bridge was made. This was made out of Wood from a tree and is the earliest surviving swing span bridge in New Zealand. The picture was taken on the Tamaki side. This was a beam bridge. In 1915 people went and reconstructed Panmure Bridge. The Bridge was made out of Wood and string. The picture is taken from the Tamaki side. This was a beam bridge. In 1916 they had the official opening for Panmure Bridge. The bridge went from Panmure and Pakuranga. The opening was on the 14 August 1916. At the time Prime Minister William Massey led the way with a traction engine.
Labels:
inquiry,
Panmure Bridge Timeline
Subscribe to:
Posts (Atom)